Elements and Performance Criteria
- Remove aircraft electrical hardware
- System is rendered safe and prepared in accordance with the applicable maintenance manual and isolation tags are fitted where necessary to ensure personnel safety.
- Removal of electrical hardware is carried out in accordance with the applicable maintenance manual.
- Required maintenance documentation is completed and processed in accordance with standard enterprise procedures.
- Removed components are tagged, packaged or discarded in accordance with specified procedures.
- Install aircraft electrical hardware
- Electrical hardware components to be installed are checked to confirm correct part numbers, modification status, serviceability and shelf life.
- Physical installation of electrical hardware is carried out in accordance with the applicable maintenance manual.
- System is reinstated to correct physical condition in preparation for testing, as necessary.
- Required maintenance documentation is completed and processed in accordance with standard enterprise procedures.